ABC NEWS NEPAL | No.1 News channel of Nepal
असार ५, २०८३ शुक्रबार
  • होमपेज
  • मुख्य समाचार
  • अर्थ वाणिज्य
  • विचार
  • खेलकुद
  • अन्तर्राष्ट्रिय
  • अन्तर्वार्ता
  • प्रदेश-विशेष
  • राजनीति विशेष
  • ENGLISH
  • समाचार
  • विशेष
  • रिपोर्ट
  • विचार
  • अर्थ वाणिज्य
  • जीवनशैली
  • प्रदेश विशेष
  • मनोरञ्जन
  • खेलकुद
  • ENGLISH
  • प्रदेशबिशेष
    • कोशी
    • मधेश
    • बागमती
    • गण्डकी
    • वाग्मती
    • कर्णाली
    • सुदूरपश्चिम
  • सोसल भिडिया
  • Facebook
  • Twitter
  • Youtube
  • Instagram

Underground electric wire installation campaign begins; PM hopeful of beautiful urban setting


एबीसी / संवाददाता
फाल्गुन ५, २०७६ सोमबार   १ : ५५   बजे

Kathmandu February 17.
An ambitious plan of installing underground electric wires in the Kathmandu Valley has formally begun. Prime Minister KP Sharma Oli today inaugurated the project amid an event here. In the first phase, the project will start in Maharajgunj and Ratnapark areas and expand to other areas gradually, according to the government’s plan. The project has been initiated by the Nepal Electricity Authority under the direction of the Ministry of Energy, Water Resources and Irrigation. Addressing the event, PM Oli said with this, a new chapter of development has started. Installation of underground telephone, electric and internet cables would add to the beauty of the cities, he said. “Stray wires will be removed under this project. Now the cities will glow,” he said, adding that the project would be expanded to major cities of the country. Efforts are underway to remove tuine ( ropeway) from across the country, he said in another context. Blacktopping roads six kilometers a day is taking place since the incumbent government was formed and around 3,000 kilometers roads have been blacktopped in a period of two years, according to him. The government was at work to expand electricity to all places of the country and export electricity in the next two years, he said. “The country has got only 500 megawatts in the past over 100 years and 500 megawatts have been added in recent years,” he said. He assured of power production on a large scale in the future. As he said, power consumption rate will also be increased gradually. According to the Prime Minister, in the past, Nepal was facing a brain drain and a campaign has begun to bring such human resources back to home

प्रतिक्रिया दिनुहोस्

ताजा अपडेट

श्रमप्रति सकारात्मक धारणा नराख्दा मुलुकले सधैं गरिवी झेल्नु पर्‍योः हर्कराज राई

अर्थतन्त्रको आधुनिकीकरण र सामाजिक न्यायका लागि करको दायरा विस्तारः अर्थमन्त्री डा. वाग्ले

सम्बन्धित

Why Doesn’t Balen Like Parliament?

Balen Style : Questions Swirl Around Nepal’s E-Passport Investigation

Prime Minister Balen Shah Accused of Lying in Parliament : Strong Opposition Outrage

Gen-Z Protests Aftershock: NHRC Targets Sushila Karki, Sudhan Gurung, Ravi Lamichhane & 50+ Others for Probe

Who Writes Our Past? -Shashi Tharoor

Diplomats need not play to the gallery

ABC NEWS NEPAL | No.1 News channel of Nepal
एबीसी मिडिया ग्रुप प्रा.लि.
  • सूचना विभागमा दर्ता नं. : २००१।०७७–०७८
  • कार्यालय सम्पर्क
  • Lazimpat, Ranibari- Kathmandu - 3
    +977 01 4240666 / 977-014011122
    Admin: [email protected]
    News: [email protected]
    विज्ञापनका लागि सम्पर्क
  • +977 9802082541, 9802060000
    [email protected]
साइट नेभिगेशन
  • गृहपृष्‍ठ
  • समाचार
  • विशेष
  • अन्तर्वार्ता
  • एबीसी विज
  • जीवनशैली
  • मनोरञ्जन
  • विचार
  • SS Opinion
एबीसी मिडिया ग्रुप प्रा.लि.टीम
  • अध्यक्ष / प्रधान सम्पादक : शुभशंकर कँडेल
  • प्रबन्ध निर्देशक : शारदा शर्मा
  • सम्पादक : डण्ड गुरुङ
  • सह-सम्पादक : कविराज बुढाक्षेत्री
©2026 ABC NEWS NEPAL | No.1 News channel of Nepal | Website by ABC Meida Group